Future Watt / Japan

Distributed energy.
Connected flexibility.

A Tokyo–Osaka commercial and industrial cluster and FIT/FIP transition assets, connected through a virtual power plant strategy.

Tokyo–Osaka C&I cluster

50+MW

Commercial and industrial distributed energy development pipeline.

01 / SCALE

FIT/FIP transition assets

20+MW

Transition assets identified in the Japanese portfolio.

02 / SYSTEM

Aggregation pathway

VPP

Virtual power plant aggregation, supported by lower-voltage grid access.

03 / VALUE

Indicative deployment pathway: 6–12 months · Portfolio figures are development capacity, not operating assets.

Japan

Low-voltage C&I cluster.

50+ MWTokyo–Osaka cluster
20+ MWFIT/FIP transition assets
6–12 monthsDeployment pathway
VPPAggregation path

The strategy uses lower-voltage grid access for faster deployment, with capacity-market and demand-response participation.

Project figures reflect the existing portfolio summary and may change as development, contracting and technical studies progress.

Future Watt New Energy

Build what’s next with us.

Discuss the portfolio ↗