Skip to content

Latvia

45MWBolderāja · BESS power capacity
120MWhBolderāja · Battery energy capacity

LATVIA / BATTERY STORAGE + GRID SERVICES

Stored energy.
Baltic grid flexibility.

Bolderāja · AI-generated architectural concept
Explore the portfolio ↓Full image ↗

Future Watt / Latvia

Storage.
For a connected grid.

Bolderāja battery storage, targeting frequency regulation and balancing services in the Baltic energy system.

Bolderāja / Power capacity

Power capacity stated in the existing Future Watt Bolderāja portfolio.

Bolderāja / Energy capacity

Battery energy capacity. Stored energy for flexible grid exchange.

Target grid services
FCR+ aFRR

Frequency regulation and balancing. Final participation is subject to project qualification.

300–700 m to a 220 kV substation, as identified in the portfolio. Final connection arrangements remain subject to technical studies.

Existing Future Watt project summary
Concept presentation · Not live telemetry

LATVIA / DIGITAL ENERGY PORTFOLIO

One project · Connected energy

Balance.
In motion.

Explore how battery storage exchanges energy with the grid.

01 / GRID TO BATTERY

Make room for energy.

Electricity flows from the grid into the battery system. Stored energy can be made available when the system needs it.

GridBattery
Project overview
LATVIA01 · Battery storage02 · Grid connectionBolderāja45 MW / 120 MWh

Model placement is conceptual, not exact project coordinates. Model and energy flow are illustrative, not live telemetry. Map: Natural Earth.

PROJECT / BOLDERĀJA

Storage for
Baltic grid services.

A battery storage concept centred on power flexibility and proximity to grid infrastructure.

01

Battery capacity

45 MW of power capacity and 120 MWh of energy capacity, as stated in the existing portfolio summary.

02

Grid proximity

The portfolio summary identifies a distance of 300–700 m to a 220 kV substation. Final connection arrangements remain subject to technical studies.

03

Frequency and balancing

FCR and aFRR are target services. The animation illustrates charging, discharge and bidirectional response; it does not represent an operating dispatch schedule.

Project figures are carried over from the existing Future Watt portfolio page. Development, contracting and technical studies may change the final configuration.

FUTURE WATT / LATVIA

Power with
flexibility built in.

Discuss the Latvia portfolio