Aerial architectural concept of a large Future Watt battery storage campus with ordered battery arrays, industrial buildings and a high-voltage substation

Romania

1,200+MWRomania · Total capacity
2,400+MWhRomania · Energy capacity

A national storage portfolio.
A stronger connection to the grid.AI-generated architectural concept

Explore the portfolio

01 / DEVELOPMENT PORTFOLIO

Infrastructure with
room to grow.

Utility-scale battery storage in Romania, anchored by a 700 MW / 1,400 MWh flagship development.

Portfolio power

MW

Utility-scale battery storage

Portfolio energy

MWh

Energy capacity across the portfolio

Battery storage projects

Developments

One national portfolio

Development portfolio · Figures from the Future Watt portfolio summaryFlagship connection 400 kV

02 / ROMANIA PORTFOLIO

Battery storage / 400 kV flagship connection

Storage meets
the grid.

A flagship battery project within a national portfolio of more than ten developments.

EXPLORE ENERGY FLOW

01 / GRID TO BATTERY

Charge the battery.

Electricity flows from the grid into the battery system. Stored energy can be made available when the system needs it.

GridBattery
01 / CHARGE

Store the power.

Electricity moves from the grid into the battery. Blue light follows the direction of charging.

02 / DISCHARGE

Return the energy.

Stored electricity flows back to the grid. The ribbon reverses to show delivery.

03 / BALANCE

Respond in both directions.

Charging and discharge respond to system needs. The model illustrates bidirectional exchange.

Romania battery storage portfolio conceptAccurate Romania country outline supporting an illustrative Future Watt battery storage model. Model placement is conceptual, not a project location. Blue energy ribbons demonstrate the exchange with the grid.ROMANIABattery storageGrid connectionFUTURE WATT / ROMANIAPortfolio concept · Placement is illustrative
Natural Earth map · Concept model

Country outline: Natural Earth. AI-generated equipment model; placement does not identify a project site. Energy flow is illustrative, not live telemetry.

03 / ROMANIA IN CONTEXT

Built on a
clear foundation.

Photograph of a contemporary building facade in Bucharest, with metallic columns and glass windows
Bucharest, Romania · Architectural detail
Local context photograph; not a Future Watt property or project.
Photography: Elenav / Pexels · License
01

Portfolio scale

The national development portfolio comprises more than ten battery energy storage projects.

02

Flagship connection

The flagship development is specified with a 400 kV grid connection.

03

Development milestones

ATR permits reported for August 2025–May 2026 in the Future Watt portfolio summary.

Project figures reflect the existing Future Watt portfolio summary and may change as development, contracting and technical studies progress.

FUTURE WATT / ROMANIA

Build the next
energy chapter.

Discuss the Romania portfolio