United States

Conceptual 1 GW AI infrastructure campus in Texas, USA, with Future Watt industrial data center buildings, upright server racks, cooling equipment, additional industrial halls, dark paved service yards and a subdued gray-blue city skyline
1,430acresTexas · Site area
160MWTexas · 2026 COD milestone

Future Watt / United States

Powered land.
AI infrastructure.

Texas powered land, grid capacity and generation infrastructure, positioned for a future AI data center co-location pathway.

Texas site area

1,430acres

Land identified for the Texas development opportunity.

01 / SCALE

Power milestone

160MW

2026 COD milestone identified in the existing portfolio.

02 / SYSTEM

Co-location pathway

AIDC

Powered land and long-term leasing for future AI infrastructure.

03 / VALUE

Development opportunity · The 160 MW figure is a stated milestone, not a claim of operating capacity.

United States / Digital Energy Portfolio
Texas

Powered Land + AI Infrastructure

1,430 acres

Site area

160 MW

2026 COD milestone

AIDC

Co-location pathway

Powered land · Long-term leasing

United States project map highlighting Texas, with an illustrated AI infrastructure campus: 1,430 acres, 160 MW 2026 COD milestone, and an AIDC co-location pathway. Concept visualization at state-level location, not to scale.

Concept visualization · State-level location · Not to scale

A 1,430-acre Texas opportunity linking powered land, grid capacity and generation infrastructure with a future AI data center campus. The existing portfolio identifies a 160 MW milestone for 2026 COD and a long-term co-location pathway for AI infrastructure.

Future Watt Texas AI campus at dusk with branded data center buildings, GPU compute infrastructure and Dallas skyline
Project concept illustration · View full-size image ↗
United States / Texas

Powered land for AI infrastructure.

1,430 acresTexas site
160 MW2026 COD milestone
AIDCCo-location pathway
Powered landLong-term leasing

The Texas opportunity links land, grid capacity and generation infrastructure with a future data center campus.

Project figures reflect the existing portfolio summary and may change as development, contracting and technical studies progress.

Future Watt New Energy

Build what’s next with us.

Discuss the portfolio ↗