Texas site area
1,430acres
Land identified for the Texas development opportunity.
01 / SCALE
Future Watt / United States
Texas powered land, grid capacity and generation infrastructure, positioned for a future AI data center co-location pathway.
1,430acres
Land identified for the Texas development opportunity.
01 / SCALE160MW
2026 COD milestone identified in the existing portfolio.
02 / SYSTEMAIDC
Powered land and long-term leasing for future AI infrastructure.
03 / VALUEDevelopment opportunity · The 160 MW figure is a stated milestone, not a claim of operating capacity.
Powered Land + AI Infrastructure
Site area
2026 COD milestone
Co-location pathway
Powered land · Long-term leasing
Concept visualization · State-level location · Not to scale
A 1,430-acre Texas opportunity linking powered land, grid capacity and generation infrastructure with a future AI data center campus. The existing portfolio identifies a 160 MW milestone for 2026 COD and a long-term co-location pathway for AI infrastructure.

The Texas opportunity links land, grid capacity and generation infrastructure with a future data center campus.
Project figures reflect the existing portfolio summary and may change as development, contracting and technical studies progress.